SOO Line Pacific #2719 Coaches Undergoing Refurbishment
These two photos were taken in Mid-May of 1998. The work on the coaches was completed by the end of June 1998. The work accomplished included the brake system, installing retention toilets, inspecting the electrical and refigeration systems, and overall safety check.