| At the half-way point in the repair process. The inspection of parts and identification of broken, bent or cracked items is complete. The work has begun to rebuild the damaged items. |
|
Randy, Lee, and Paul guide the forktruck into position for removing the R3 spring. photo credit David G. Peterson |

|
Lee discussing the removal process with Jon and Gary.
photo credit David G. Peterson |

|
Jon disassembling one of the equalizing hangers.
photo credit David G. Peterson |

|
Jon and Randy lowering a spring rigging part to the floor.
photo credit David G. Peterson |

| The area of the boiler where the air-compressor studs
were torn out. Note the plugs in the former mounting holes.
These were used to secure the boiler for hydrostatic testing.
photo credit David G. Peterson |